Secretary of the Interior Deb Haaland and Secretary of Commerce Gina Raimondo announced on May 11 approval of the construction and operation of the Vineyard Wind project — the first large-scale, offshore wind project in the United States. The Secretaries were joined in the announcement by labor leaders who have been working to ensure that the project is built and maintained by union labor. (Logo quoted from Yahoo’s image)

 

The 800-megawatt Vineyard Wind energy project will contribute to the Biden-Harris administration’s goal of generating 30 gigawatts of energy from offshore wind by 2030. The project will be located approximately 12 nautical miles offshore Martha's Vineyard and 12 nautical miles offshore Nantucket in the northern portion of Vineyard Wind’s lease area. It will create 3,600 jobs and provide enough power for 400,000 homes and businesses.

 

In its first four months, the Biden-Harris administration has catalyzed the offshore wind industry by announcing the first ever national offshore wind energy mandate, creating a roadmap for the future of this innovative industry. Achieving the 30 gigawatt goal is anticipated to result in the creation of tens of thousands of living wage, family-supporting union jobs while positioning America to lead a clean energy revolution and tackle the climate crisis. Building the offshore wind supply chain can feed steel mills in West Virginia, support ship building in Texas, and wind turbine manufacturing in both inland areas and on the coasts.

 

Record of Decision (ROD) grants Vineyard Wind final federal approval to install 84 or fewer turbines off Massachusetts as part of an 800-megawatt offshore wind energy facility. The project is expected to create 3,600 area jobs and will power up to 400,000 homes. Turbines will be installed in an east-west orientation, and all the turbines will have a minimum spacing of 1 nautical mile between them in the north-south and east-west directions, consistent with the U.S. Coast Guard recommendations in the Final Massachusetts and Rhode Island Port Access Route Study.

 

The ROD adopts mitigation measures to help avoid, minimize, reduce, or eliminate adverse environmental effects that could result from the construction and operation of the proposed project. These mitigation, monitoring, and reporting requirements were developed through input, consultation, and coordination with stakeholders, Tribes, and federal and state agencies. For more information, please see appendix A of the ROD.

 

The ROD is jointly signed by and addresses permitting decisions by BOEM, U.S. Army Corps of Engineers, and the National Marine Fisheries Service within the National Oceanic and Atmospheric Administration.

 

Prior to construction, Vineyard Wind must submit a facility design report and a fabrication and installation report. These engineering and technical reports provide specific details for how the facility will be fabricated and installed in accordance with the approved Construction and Operations Plan.

 

In addition to the announcement, since January 20, the Department has initiated the environmental review of two other offshore wind projects, and pursued additional leasing opportunities in the New York Bight.

 

(IRuniverse)